Septic Systems
…The District established a regional wastewater utility for existing development ,and to ensure that future development would not harm the Loxahatchee River through wastewater discharges. By the mid-1980s, the small…
…The District established a regional wastewater utility for existing development ,and to ensure that future development would not harm the Loxahatchee River through wastewater discharges. By the mid-1980s, the small…
…and data on the river compiled by the WildPine Lab. To obtain copies, please contact the WildPine Lab at (561) 401-4058 or wildpine@lrecd.org. Search the Bibliography Download the full list…
Design Standards Find information on our design standards Development Guidelines With specific regard to new development, the District’s legislated policy is to provide the required utility services to the area…
…The Florida Department of Financial Services web page is: http://www.myfloridacfo.com/, and their Local Government Financial Reporting app is available here: https://apps.fldfs.com/LocalGov/Reports/default.aspx Rate Studies FY2022 Rate and Connection Fee Study …
…service on the Loxahatchee River Environmental Control District Board, he serves as a Commissioner on the Governing Board of the Palm Beach County Sports Commission, where he Chairs the Sports…
…resources may apply. WildPine Laboratory Internship Semesters available: Summer- May to August Fall- September to December Spring- January to May Applicants should apply for each semester at least 3 months…
…water supplies for the natural system and to meet our drinking water needs. More information on IQ Water and Reuse. River Research The WildPine Laboratory is our state-certified laboratory that…
…immediately following the 60-day treatment phase of the project. In the coming weeks we will compile and review all of the analysis results. We will also do computations to try…
To assist with research programs, the Loxahatchee River District has a state-certified laboratory which provides the needed scientific staff, equipment and professional analysis of daily plant operations, as well as…
…1/8-inch (3 millimeters, mm). All captured screenings are routed to a screenings washer-compactor unit where they are dewatered, and the captured solids are discharged to a dumpster for offsite disposal. …